Arditi, D and Gunaydin, H M (1998) Factors That Affect Process Quality in the Life Cycle of Building Projects. Journal of Construction Engineering and Management, 124(03), 194–203.

Eskins, W A (1998) CONSTRUCTION OF THE NEW COLEMAN BRIDGE: FIFTH ROEBLING LECTURE, 1997. Journal of Construction Engineering and Management, 124(03), 173–5.

Everett, J G, Halkali, H and Schlaff, T G (1998) Time-Lapse Video Applications for Construction Project Management. Journal of Construction Engineering and Management, 124(03), 204–9.

Hegazy, T and Ayed, A (1998) Neural Network Model for Parametric Cost Estimation of Highway Projects. Journal of Construction Engineering and Management, 124(03), 210–8.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(210)
  • Abstract:
    This paper uses a neural network (NN) approach to effectively manage construction cost data and develop a parametric cost-estimating model for highway projects. Eighteen actual cases of highway projects constructed in Newfoundland, Canada, have been used as the source of cost data. Rather than using black-box NN software, a simple NN simulation has been developed in a spreadsheet format that is customary to many construction practitioners. As an alternative to NN training, two techniques were used to determine network weights: (1) simplex optimization; and (2) genetic algorithms (GAs). Accordingly, the weights that produced the best cost prediction for the historical cases were used to find the optimum NN. To facilitate the use of this NN on new projects, a user-friendly interface was developed using spreadsheet macros to simplify user input and automate cost prediction. For practicality, sensitivity analysis and adaptation modules have also been incorporated to account for project uncertainty and to reoptimize the model on new historical data. Details regarding model development and capabilities have been discussed in an attempt to encourage practitioners to benefit from the NN technique.

Jaselskis, E J and Talukhaba, A (1998) Bidding Considerations in Developing Countries. Journal of Construction Engineering and Management, 124(03), 185–93.

Mattila, K G and Abraham, D M (1998) Resource Leveling of Linear Schedules Using Integer Linear Programming. Journal of Construction Engineering and Management, 124(03), 232–44.

Rosenfeld, Y, Navon, R and Cohen, L (1998) Methodology for Prioritizing Cost-Effective Construction Technologies. Journal of Construction Engineering and Management, 124(03), 176–84.

Shash, A A (1998) Bidding Practices of Subcontractors in Colorado. Journal of Construction Engineering and Management, 124(03), 219–25.

Slaughter, E S (1998) Models of Construction Innovation. Journal of Construction Engineering and Management, 124(03), 226–31.